Skip to content
Let’s Fix Indy
Donate Now
Back to the story

All photos.

Block D before and after, and our visit to Independence Hall.

Block D · Before and after

Work by the Let’s Fix Indy team

Outside walls
Showers
Urinals
Corridor doors and walls
Side wall
Washbasins

Block D · During the work

Scaffolding up the louvred tower
Painting the side wall
New fittings, delivered
Scaffolding along the balconies
New water pipes
A washroom being re-tiled
A new toilet
Fitting new washbasins
A repainted tower and side wall
A re-tiled washroom
New washbasins
A re-tiled shower area
A re-tiled washroom, before the fittings

Block D · Today

Block D from the road
Looking down the road to Block D
The balconies, from the courtyard
Balconies and the courtyard tree
Rooms and balconies
Block D and the covered walkway, from above
A repainted end wall
Another repainted end wall
New showers
A door and window, repainted
Corridor doors and windows
A repainted room
A room’s desk and shelf
A room door
The balconies, from the lawn
Block D and the road

The visit

Katangites at the visit
At the “Indy, Home” wall
At the hall
At the hall

The goal

Independence Hall from above